Concrete Driveway Cost in Charleston, WV

In Charleston, our installed price for a plain broom finish is $5 to $10 per square foot. Color or exposed aggregate costs $8 to $14, stamped concrete $10 to $21, and the free written quote that follows a site visit gives the figure for your property.

The Charleston driveway cost article works one drive through, and the national driveway cost guide covers sizing. The right slab depends on the soil, the drainage, local permit rules and how the surface will be used. Requirements vary by site, scope and jurisdiction; the city or county permit office, and a site visit before the quote is final, determine what applies.

What each finish involves is on the Charleston, WV services page, and the towns we serve are on the Charleston, WV page.

Our Concrete Prices for the Charleston Area

Concrete Driveways

$5 to $10 per sq ft

Our broom finish, installed. Tint or exposed stone runs $8 to $14 per square foot, and an old slab, if there is one, comes out at $1 to $4.

Concrete Patios

$5 to $10 per sq ft

Broom finish on a pad pitched away from the house, installed. Tint or exposed stone moves the rate to $8 to $14 per square foot.

Stamped & Decorative Concrete

$10 to $21 per sq ft

A pressed pattern and color on a drive, patio or walk, installed. How intricate the pattern is, and how many colors it carries, place a job in the range.

Concrete Walkways & Sidewalks

$5 to $10 per sq ft

Broom finish, installed. A walk that runs up a slope is laid out first, and any grading it needs appears on its own line of the quote.

Every figure here is our installed price per square foot. Your Charleston quote is free and written for your property. Final scope and pricing are confirmed after the site has been inspected and the project requirements have been documented.

What Moves a Charleston Concrete Quote

The Finish

Broom finish is where our prices begin. Tint, exposed stone and stamping each raise the rate, and a hillside house can pair a stamped back patio with a plain front drive.

An Old Slab

A slab that has to come out first adds $1 to $4 per square foot. It is shown as its own line on the written quote.

Slope and Grading

On a steep lot, cutting a bench, filling the low side and carrying runoff past the slab can take a good share of the job. Those lines appear on the quote apart from the square-foot rate.

The Base

A hillside base is built to let water out from under the slab. Base stone, compaction and any soft spot found on site move a job up or down inside its range.

The City Permit

A driveway inside Charleston adds a step with the city Building Department. The permit shows as its own item on the written quote, and the city sets any fee.

Charleston Concrete Cost FAQ

If the old slab comes out, is that in the price?
No. Taking out concrete is $1 to $4 per square foot and gets its own line, so the demolition is visible. The amount that comes out is measured at the visit.
Does a steep drive cost more per square foot?
Not in the rate: plain broom stays $5 to $10. A climbing or cut-in drive adds grading and drainage work, and those show as separate lines on the written quote.
What does the permit add to my budget?
Inside Charleston, the driveway permit comes from the city Building Department and is itemized on our written quote. The city sets any fee, so we print none, and the amount depends on the address.
How far apart are plain and stamped?
Stamped is $10 to $21 per square foot and plain broom is $5 to $10. Within the stamped range, the pattern and the number of colors decide where a job falls.