Guides

Austin Driveway Permit Guide

Stoutwell Concrete · September 27, 2026 · 6 min read

freshly finished concrete driveway at a newly built home

Austin Transportation and Public Works handles driveway work in the right-of-way through a Driveway/Sidewalks (DS) permit. A building permit creates one automatically; without one, the application is a stand-alone permit in Austin Build + Connect. The city also names a ROW Contractor’s License for this work, and the city is the one to say whether a specific job qualifies. Georgetown, Lakeway and other cities set their own rules.

What the DS Permit Covers in Austin

Austin’s right-of-way permits page lists several permit types. Driveway/Sidewalks (DS) is the entry for driveway, sidewalk, curb and gutter work. That entry also addresses doubt: it says “If you are unsure if your work qualifies for this permit,” and then gives an email address for help. The city, not a contractor or a web page, answers whether a job fits.

The same page has a ROW Permit Fees section and notes that fees may apply. Current amounts are best read there. For the pouring side, see Greater Austin concrete driveways.

Applying With or Without a Building Permit

Under the question about what to know before applying, the city’s answer depends on whether the project already has a building permit (BP):

  • With a BP: “one DS permit is automatically created,” and “The DS permit number is the same as the BP number.”
  • Without a BP: apply for a stand-alone DS permit at Austin Build + Connect.

For a stand-alone application, the page has the applicant pick “Apply for Right of Way Permits / Special Events” from the menu, then “Driveway / Sidewalks” to see the application options. The description asks for “Who, What, When, Where, Why, How,” which is a plain way of saying the entry should name the work, the date and the location.

Residential Review Plans and One Permit per Driveway

Where a DS is tied to residential development, the page says to “provide stamped/approved plans from Residential Review.” It then adds: “If you are performing repairs and/or replacements, then no further documentation will be needed.” That sentence is about paperwork, not about whether a permit is needed, and whether a job fits is the city’s call.

Two counting rules follow on the same page:

  • “If there are multiple driveways, each must have its own DS permit.”
  • “If this is a semi-circular driveway, the work will be done under one DS permit.”

A home with a second driveway should plan for a second permit, while a semi-circular driveway is one.

The page also covers a Residential DS that is “not designed to standard.” For that case it says to coordinate with the Land Development Engineering division and to check out the Residential Review Guideline Manual. It does not say what counts as “not designed to standard,” so the manual and the city are where to look. The Land Development Engineering page describes Residential ROW Review as “Review of driveway and sidewalk plans for constructability and right of way (ROW) code compliance.”

The ROW Contractor’s License and Authorized Agents

The DS entry says work of this kind in the right-of-way calls for a ROW Contractor’s License. The city’s Right-of-Way Contractors page explains how that credential works.

It says “The following four documents must be provided”: a bond, insurance, a resolution of authority and an Authorized Agent Form. It also says “The License remains valid until either the Bond and/or Insurance (on file with our office) expires,” and adds “The individual documents do NOT share expiration dates.” The page links to a list of the license holders, which is the place to check a company by name.

The Authorized Agent Form (AAF) matters to anyone else on the job. The contractors page says “You may only add a Right-of-Way Contractor to your permit if they have listed you on their Authorized Agent Form (AAF).” The permits page says the same from the other side: “To submit or pull a permit on a ROW Contractor’s behalf, you must be listed on their Authorized Agent Form.”

Subcontractors get their own line. The permits page says subcontractors who will impact the right-of-way must be named on the permit, and it attaches a credential requirement to them as well. Who may apply, and in what role, is a question for the city.

Inspections, Fees and What to Settle First

On inspections, the page says “To add or remove the required DS inspections listed on the Plan Review (PR) or BP, contact the Austin Development Services (ADS).” So the required inspections are listed on the plan review or building permit, and changes go through that department. The page does not give a sequence or timing.

Before a job is booked, settle which permit applies, who will apply, and what the quote covers. For how finishes are priced, see Austin concrete driveway prices, and for what each pour involves, see Austin concrete services.

The right slab depends on the soil, the drainage, local permit rules and how the surface will be used. Requirements vary by site, scope and jurisdiction; the city or county permit office, and a site visit before the quote is final, determine what applies.

What to Ask an Austin Contractor

Before booking work that touches the street edge, put these in writing:

  • Does the company hold a current City of Austin ROW Contractor’s License, and is it on the active list?
  • Who will pull the DS permit, and is that person on the contractor’s Authorized Agent Form?
  • Will any subcontractors be named on the permit?
  • Are Residential Review plans needed for this driveway?
  • Are permit fees in the quote?

More general hiring questions are in how to find a reliable concrete contractor. TDLR, the state agency for trade credentials, lists no program for concrete flatwork, so the city’s own right-of-way credential is the one to ask about.

Frequently Asked Questions

How does a stand-alone Austin DS permit application work?

Without a building permit, the city says to apply for a stand-alone DS permit in Austin Build + Connect. The applicant chooses Apply for Right of Way Permits / Special Events, then Driveway / Sidewalks, and writes a description covering who, what, when, where, why and how.

What does Austin’s Authorized Agent Form do?

It lists the organizations and individuals that may submit or pull permits using a ROW Contractor’s License. The city says that to submit or pull a permit on a ROW Contractor’s behalf, you must be listed on their Authorized Agent Form, and a contractor can only be added to a permit if it has listed you.

Does each Austin driveway need its own DS permit?

The city’s page says that if there are multiple driveways, each must have its own DS permit. It adds that a semi-circular driveway is done under one DS permit. How a particular property is counted is the city’s call.

Does the Austin permit apply in Georgetown or Lakeway?

No. These are Austin’s rules for work in Austin’s own right-of-way. Georgetown and Lakeway are separate cities with their own permit offices, so a property there should ask that city.

Stoutwell Concrete forms and pours driveways, extensions and replacements around Austin. Ask for a free Austin quote to talk through a project.

Ready for a Free Quote?

Get a free, no-obligation quote for property in Greater Austin.

Get Your Free Quote

Or call us directly: (919) 219-2946

Call Free Quote