Pouring Concrete in Austin Weather

Stoutwell Concrete · September 27, 2026 · 6 min read

stamped slate-pattern concrete patio under a covered porch

The National Weather Service’s Austin Camp Mabry (ATT) station, using 1991 to 2020 normals, puts the August high at 97.8 F. May is the wettest month at 5.04 inches. About 11.9 days a year bring a low at or below 32 F, mostly from December to February. For a driveway, patio or walkway pour, long hot stretches matter most, with rain and a few cold nights behind them.

Camp Mabry Normals Month by Month

Every number in this layout is read from the NWS sheet of Austin Camp Mabry monthly normals. NOAA’s monthly normals file for Austin-Camp Mabry repeats each value and gives the 1991 to 2020 span.

MonthDaytime high (F)Overnight low (F)Precipitation (in)Freezing-night days (low at or below 32 F)
January62.541.82.644.7
February66.545.81.892.3
March73.352.22.880.7
April80.358.92.420
May86.966.85.040
June93.272.93.680
July96.675.01.960
August97.875.12.740
September91.470.13.450
October82.560.83.910
November71.550.52.920.8
December63.943.42.723.4

Read each row as a 30-year average from a single weather station. It predicts nothing about a given pour day, and readings elsewhere in the metro can differ. For ground and permit questions, see our page for Austin concrete contractors.

The Hottest Weeks Are Also Dry Ones

June averages a normal high of 93.2 F, July 96.6 F, August 97.8 F and September 91.4 F. The hottest stretch also falls in a dry part of the year. July gets 1.96 inches of rain, which is second only to February’s 1.89 for the lowest of any month.

So in midsummer the bigger worry is fast drying, not storms. A hot-weather bulletin from the ready-mix trade warns that warm concrete loses workability sooner and can lose some of its entrained air. Its advice is to plan the timing so trucks, placing and finishing never hold each other up. It also mentions cooling the batch with ice or cold water, and wetting forms, steel and ground without letting puddles form. Afterward, curing holds moisture in the slab; the guide on how long concrete takes to cure covers what that involves.

A May Rain Peak, Then October

Rain does not follow the heat. May is the wettest month at 5.04 inches. October is next at 3.91, then June at 3.68 and September at 3.45. Over a full year the normals add up to 36.25 inches.

A downpour is a hazard while the surface is still fresh. A trade note on surface dusting says not to trowel while bleed water sits on the slab, not to sprinkle water on to ease finishing, and not to leave fresh concrete open to rain or drying wind. Any of those can leave a weak, powdery skin. A pour set for a wet spring week or a rainy October day needs a rain plan.

About a Dozen Freezing Days, Mostly Midwinter

Freezing nights are few but real. In the normals, January logs 4.7 days with a low at or below 32 F and December 3.4. February adds 2.3, November 0.8 and March 0.7, which totals 11.9 days a year. December to February holds 10.4 of them.

January’s normal low is 41.8 F, its average 52.2 F and its normal high 62.5 F, so a mild afternoon can still follow a freezing night. A cold-weather bulletin from the ready-mix industry, dated 1998, defines cold weather as a daily average under 40 F lasting beyond three days. A lone night at or below 32 F can occur without meeting that definition, so ask about cover anyway. The bulletin adds:

  • Concrete still workable when it freezes may lose over half its potential strength.
  • It needs protection from freezing until it has gained enough strength.
  • Setting takes about twice as long for each 20 F fall in its temperature.
  • Insulated blankets and tarps are typical cover, removed gradually.

Settling an Austin Pour Date With the Contractor

Summer heat, the odd cold night and rain in May or October each affect the calendar. Raise these questions before booking:

  • How are hot-day deliveries timed so loads do not idle, and is the batch cooled? Ask the contractor.
  • Is the ground wetted before a hot pour, and do no puddles remain? Ask the contractor.
  • How long does curing go on after finishing? Ask the contractor.
  • What goes over the slab on a night forecast near 32 F? Ask the contractor.
  • What protects the surface in a storm, and who decides whether the pour moves? Ask the contractor.

The right slab depends on the soil, the drainage, local permit rules and how the surface will be used. Requirements vary by site, scope and jurisdiction; the city or county permit office, and a site visit before the quote is final, determine what applies.

Frequently Asked Questions

What is the hottest month for pouring concrete in Austin?

August, with a normal high of 97.8 F at the National Weather Service’s Austin Camp Mabry (ATT) station for 1991 to 2020. July follows at 96.6 F, then June at 93.2 F and September at 91.4 F. July is also one of the driest months, with 1.96 inches of rain.

Which month brings Austin the most rain?

May, at 5.04 inches in the Camp Mabry normals. October comes next at 3.91 inches, then June at 3.68 and September at 3.45. The year adds up to 36.25 inches, and February is the driest month at 1.89 inches.

How many freezing days does Austin get?

About 11.9 days a year bring a low at or below 32 F, led by January (4.7) and December (3.4). February has 2.3, November 0.8 and March 0.7. Concrete that freezes while still workable may lose over half its potential strength, so a cold night still deserves a plan.

What should I ask before setting an Austin pour date?

Ask how hot-day deliveries are timed, whether the mix is cooled, how the subgrade is dampened, how long curing continues, what protects the slab on a near-freezing night, what shields it from rain, and who decides whether the pour moves.

Stoutwell Concrete serves Greater Austin with new driveways, patios and walkways. Our prices for each finish appear in the Austin concrete driveway prices guide. When you are ready, Get your free Austin concrete quote.

Ready for a Free Quote?

Get a free, no-obligation quote for property in Greater Austin.

Get Your Free Quote

Or call us directly: (919) 219-2946

Call Free Quote